It might be no match for the 28th annual French Quarter Festival, but Big Lift III is expected to draw dozens of engineering enthusiasts this weekend to witness the spectacle as a 528-foot-long steel truss is hoisted onto the Huey P. Long Bridge.
The bridge will be closed for up to 48 hours starting Saturday at 5 a.m. as the last of three massive truss sections is installed as part of the $1.2 billion project to widen the notoriously narrow bridge.
The first two Big Lifts in June and Nove
Tidak ada komentar:
Posting Komentar